| SECTION 1 |
STATEMENT OF OPERATIONS |
6 |
| 1.1 |
Preliminary Statement |
6 |
| 1.2 |
Principal Officers and Directors |
6 |
| 1.3 |
Areas Served |
6 |
| 1.4 |
Persons Authorized to Communicate with Board |
6 |
| SECTION 2 |
DEFINITIONS |
7 |
| 2.1 |
Cooperative |
7 |
| 2.2 |
Applicant |
7 |
| 2.3 |
Member-Consumer |
7 |
| 2.4 |
IUB |
7 |
| 2.5 |
Premises |
7 |
| SECTION 3 |
REQUIREMENTS FOR SERVICE |
8 |
| 3.1 |
Application |
8 |
| 3.2 |
Membership |
8 |
| 3.21 |
Service Contracts |
8 |
| 3.3 |
Member-Consumer Deposits |
8 |
| 3.31 |
Amount of Deposit |
8 |
| 3.32 |
Interest on Deposit |
9 |
| 3.33 |
Receipts |
9 |
| 3.34 |
Account Refund |
9 |
| 3.35 |
Additional Deposits |
9 |
| 3.36 |
Non-Compliance |
9 |
| 3.4 |
Right-of-Way |
9 |
| 3.41 |
Procurement |
9 |
| 3.42 |
Initial Clearing |
10 |
| 3.43 |
Applicant's Premises - Right-of-Way |
10 |
| SECTION 4 |
CHARACTERISTICS OF SERVICE |
11 |
| 4.1 |
Standard |
11 |
| 4.2 |
Character |
11 |
| 4.3 |
Classes |
11 |
| 4.4 |
Primary Voltage |
11 |
| SECTION 5 |
SERVICE EXTENSIONS |
12 |
| 5.1 |
Availability |
12 |
| 5.11 |
Point of Delivery |
12 |
| 5.12 |
Delivery Outside Coop Service Area |
12 |
| 5.2 |
Service Classifications |
12 |
| 5.21 |
Regular Farm and Home Service |
12 |
| 5.22 |
Residential (Non-Farm) Service |
13 |
| 5.23 |
Non-Residential, Low Use Service |
13 |
| 5.24 |
Commercial and Single-Phase Industrial Service |
13 |
| 5.25 |
Special Classifications |
13 |
| 5.26 |
Temporary Service |
13 |
| 5.27 |
Multi-Phase Service |
14 |
| 5.28 |
Large Power Contracts |
14 |
| 5.3 |
Transformer Size |
14 |
| 5.4 |
Electric Energy Sales Estimate |
14 |
| SECTION 6 |
REFUSAL OR DISCONNECTION OF SERVICE |
15 |
| 6.1 |
Reasons for Denying Service |
15, 16, 17, 18, 19, 20 |
| 6.2 |
Insufficient Reasons for Denying Service |
21 |
| 6.3 |
Resale of Energy |
21 |
| 6.4 |
Customer Rights and Remedies to Avoid Disconnection |
21, 22, 23, 24 |
| 6.5 |
Prior Indebtedness |
25, 26 |
| SECTION 7 |
METER INSTALLATIONS |
27 |
| 7.1 |
Ownership |
27 |
| 7.11 |
Meter Location |
27 |
| 7.12 |
Meter Placement |
27 |
| 7.13 |
Multi Service Through One Meter |
27 |
| 7.2 |
Types of Meter Loop Installations |
28 |
| 7.21 |
Self-Contained Metering |
28 |
| 7.22 |
Meter Loop Construction |
28 |
| 7.23 |
Current Transformer Installation |
28 |
| 7.3 |
Temporary Meter Loops (Construction Sites) |
28 |
| 7.4 |
Primary Metering |
28 |
| 7.5 |
Meter Seals |
28 |
| SECTION 8 |
OVERHEAD AND UNDERGROUND ELECTRIC FACILITIES |
29 |
| 8.1 |
Conditions of Service |
29 |
| 8.2 |
Specifications |
29 |
| 8.21 |
Self-Contained Metering |
29 |
| 8.22 |
Current Transformer Metering |
29 |
| 8.3 |
New Underground Facilities - Platted Areas |
29 |
| 8.31 |
Easements |
29 |
| 8.32 |
Grade and Terrain |
30 |
| 8.33 |
Cost of Construction |
30 |
| 8.4 |
Single Service Line Extensions on Private Property |
30 |
| 8.5 |
Replace Existing Facilties with Underground Facilities |
31 |
| SECTION 9 |
WIRING STANDARDS |
32 |
| 9.1 |
Cooperative's Requirements |
32 |
| 9.11 |
IFEC Wiring Specifications |
32 |
| 9.12 |
Inspections |
32 |
| 9.2 |
Member-Consumer's Responsibility |
32 |
| SECTION 10 |
METER READING |
33 |
| 10.1 |
Cooperative's Responsibility |
33 |
| SECTION 11 |
BILLING PROCEDURE |
34 |
| 11.1 |
Type of Billing |
34 |
| 11.2 |
Billing Period |
34 |
| 11.3 |
Due Date |
34 |
| 11.31 |
Bill |
34 |
| 11.32 |
Late Payment Charge |
34 |
| 11.33 |
Forgiveness of One Late Payment |
35 |
| 11.34 |
Change of Date of Delinquency |
35 |
| 11.4 |
Failure to Receive Bill |
35 |
| 11.5 |
Level Payment Plan |
35 |
| 11.6 |
Parties Responsible for Payment |
35 |
| 11.7 |
Billing Information |
35 |
| SECTION 12 |
Procedure |
36 |
| 12.1 |
Procedure |
36 |
| 12.11 |
Payment Agreements |
36 |
| 12.2 |
Returned Checks |
37 |
| 12.3 |
Reconnection Charge Resulting From Nonpayment of Energy Account |
37 |
| SECTION 13 |
METER TESTING |
38 |
| 13.1 |
Routine Testing |
38 |
| 13.11 |
Limits |
38 |
| 13.12 |
New Meters |
38 |
| 13.2 |
Request Test |
38 |
| 13.21 |
Referee Tests |
38 |
| 13.3 |
Adjustments |
39 |
| 13.31 |
Meter Error |
39 |
| 13.32 |
Determination of Adjustment |
39 |
| 13.33 |
Refunds |
40 |
| 13.34 |
Back Billing |
40 |
| 13.35 |
Overcharges |
41 |
| 13.36 |
Undercharges |
41 |
| 13.4 |
Grounds on Member-Consumer's Premises |
41 |
| 13.5 |
Special Metering Installation |
41 |
| SECTION 14 |
UNCOLLECTED ACCOUNTS |
42 |
| 14.1 |
Service Reconnection |
42 |
| 14.2 |
Collection Agency |
42 |
| 14.3 |
Patronage Dividend Deductions |
42 |
| SECTION 15 |
TEMPORARY DISCONNECTS |
43 |
| 15.1 |
Definition |
43 |
| 15.2 |
Availability |
43 |
| 15.3 |
Charges and Rules |
43 |
| SECTION 16 |
IDLE SERVICES |
44 |
| 16.1 |
Definition |
44 |
| 16.2 |
Charges |
44 |
| 16.3 |
Rebuilding |
44 |
| SECTION 17 |
SERVICE CALLS |
45 |
| 17.1 |
Cooperative's Responsibility |
45 |
| 17.2 |
Member-Consumer's Responsibility |
45 |
| 17.3 |
Charges |
45 |
| SECTION 18 |
RELOCATION OF FACILITIES |
46 |
| 18.1 |
Cooperative's Facilities |
46 |
| 18.2 |
Member-Consumer's Facilities |
46 |
| 18.3 |
Moving of Buildings |
46 |
| SECTION 19 |
USE OF COOPERATIVE'S FACILITIES |
47 |
| 19.1 |
Cooperative Facilities |
47 |
| 19.2 |
Meter Pole |
47 |
| 19.3 |
Poles Owned by Cooperative Other Than Meter Poles |
47 |
| 19.4 |
Non-Liability of Cooperative |
47 |
| SECTION 20 |
DAMAGE TO COOPERATIVE'S FACILITIES |
48 |
| 20.1 |
Member-Consumer's Responsibility |
48 |
| 20.2 |
Protection of Cooperative's Facilities on Member-Consumer's Premises |
48 |
| SECTION 21 |
LIGHTING SERVICE |
49 |
| 21.1 |
Definitions |
49 |
| 21.2 |
Availability |
49 |
| 21.3 |
Type of Light |
49 |
| 21.4 |
Service |
49 |
| 21.5 |
Charges |
49 |
| 21.6 |
Member-Consumer Permission |
50 |
| 21.7 |
Public Lighting Service Availability |
50 |
| 21.8 |
Type of Light |
50 |
| 21.9 |
Charges |
50 |
| SECTION 22 |
SPECIAL CONDITIONS OF SERVICE |
51 |
| 22.1 |
Corrective Equipment |
51 |
| 22.2 |
Arc Welding Installations |
51 |
| 22.3 |
Requirements for Electric Motors |
51 |
| 22.31 |
Safety Requirements |
51 |
| 22.32 |
Protective Devices |
51 |
| 22.33 |
Large Motor Applications |
51 |
| 22.34 |
Starting Equipment |
52 |
| 22.35 |
Maximum Single-Phase Loads |
52 |
| 22.4 |
Standby Generators |
52 |
| 22.5 |
New Structure Energy Conservation Standards |
52 |
| SECTION 23 |
COMPLAINTS |
53 |
| 23.1 |
Member-Consumer Complaints |
53 |
| 23.2 |
Records |
53 |
| SECTION 24 |
INSPECTION OF ELECTRICAL PLANT |
54 |
| 24.1 |
Periodic Inspection |
54 |
| 24.2 |
Inspection Forms |
54 |
| 24.3 |
Filing |
54 |
| 24.4 |
Construction and Maintenance |
54 |
| SECTION 25 |
FORMS AND CONTRACTS |
55 |
| SECTION 26 |
RETAIL RATE SCHEDULES |
56 |
| 26.1 |
Single Phase |
56 |
| 26.2 |
Electric Heat |
56 |
| 26.3 |
Leased Security Lights |
56 |
| 26.4 |
Member Owned Lights |
56 |
| 26.5 |
Small Commercial |
57 |
| 26.6 |
Large Commercial |
59, 60 |
| 26.7 |
Large Power |
61 |
| 26.8 |
Interruptible Large Power Rate |
63, 64, 65 |
| SECTION 27 |
CO-GENERATION AND SMALL RATE POWER PRODUCTION SERVICE |
68 |
| 27.1 |
Availability |
68 |
| 27.2 |
Definitions |
68 |
| 27.3 |
Requirements for Interconnection |
69 |
| 27.31 |
Acceptable Standards |
69, 70, 71 |
| 27.4 |
Prices |
72 |
| 27.41 |
Prices for purchases by the member-consumer from the Cooperative |
72 |
| 27.42 |
Prices for purchases by the Cooperative from member-consumer |
72 |
| 27.43 |
Wheeling Charges |
72, 73 |
| SECTION 28 |
ELECTRIC TAX ADJUSMENT RIDER #1 |
74 |
| SECTION 29 |
ALTERNATIVE ENERGY PROGRAM |
75 |